Sassy+ · Zeekr
The European debut of the Zeekr 7GT, produced out of a meeting room on the stand, rehearsed four times and struck before the doors opened.
The challenge
Larry Gale at Sassy+ first got in touch at the start of December. Zeekr was bringing the 7GT to Europe for the first time at the Brussels Motor Show, and the press conference was set for the opening of the show in early January.
A motor show does not move. The car goes under the cover, the press are in the hall at a published time, and the stand opens to the public on the hour whether or not the production is ready. Between the first phone call and that hour sat the festive period, with the people who needed to make decisions away for most of it.
Sassy+ came to us for the production. The whole broadcast side of the launch needed a home: the gallery, the cameras, the graphics and playback, the audio, the delivery, and the crew to run all of it, specified and booked and made to behave as one production on a stand that several other teams were building at the same time.

The approach
The useful thing we did in December was not technical. It was staying on it. We kept the specification, the crew and the kit list moving through a period when diaries were thin, so that every time Sassy+ came back to it there was progress to look at rather than a list of things still to decide. By the time everyone was in the same room, the shape of the show was settled and the client knew exactly what they were getting.
That is the part of this job we are proudest of. A launch like this is stressful enough for the people whose brand is on the wall. The production should be the reassuring bit.
We built the gallery inside the meeting space on the Zeekr stand. That room is Zeekr's own place to sit down with people, press and public alike, anyone who wants to talk about the car or buy one, so the whole rig had to fit around the furniture and the people, and it had to come out again cleanly. Day one was load in and rehearsal. Day two was four full rehearsals, then the live press conference, then a strike that had to be finished before the show floor opened and the room went back to doing its real job.

With two days to go the client asked for a high shot looking down over the car. We put one of the PTZs on a three metre lighting stand, which got the camera up where the shot needed it without taking any more floor space on a stand that had none to give.
The show went out on two encoders running on two independent paths, primary and backup. A motor show press conference happens once, at a published time, in front of the people whose job is to write about it, which is exactly the situation a second path exists for.
The press conference opened with a long form film covering the car's specification and the headline messages, played out from our system. A senior Zeekr executive then joined the host on stage for a short interview, the 7GT was revealed, and the two of them walked around and into the car live on camera.
The walk and talk ended with people sitting inside the 7GT, and in rehearsal it became obvious that the interior was reading dark. That shot was on the Ronin 4D, moving with the presenters, so the fix needed to be a lighting one rather than something pulled live on the lens.
We had a small inflatable work light in the kit. It went into the car and sat tucked above the sun visor, invisible from outside, throwing just enough light back onto the faces to make the interior shot work. Four rehearsals is what buys you the chance to find something like that before it matters.
A motor show stand at launch is a crowded place, and we were one team of several.
Our job, on top of running the show, was to make all of that behave as one production.

The kit
| Switching | Blackmagic Design ATEM Constellation 8K |
|---|---|
| Cameras | Sony FX9 on sticks as the main camera, four PTZs placed around the stand, wireless DJI Ronin 4D as the mobile camera |
| Playback and graphics | vMix |
| Audio | Broadcast mix, Green-GO comms, presenter IFB, press split box for journalists' own recordings. Spec'd by Production Solutions, provided by DiverZe |
| Delivery | LiveU Solo and Blackmagic Design encoders, primary and backup on two independent paths, to Castr |
| Record | Blackmagic Design HyperDeck master |
| Stand LED wall | Dedicated mixed feed built in our gallery: scaled wireless camera, static logo, or full screen playback, taken by the wall's own mixer |
| Crew | EIC, vision mixer, graphics operator, A1, three camera operators |

The 7GT made its European debut live, on time, to a room full of press, with the feed going out for onward distribution and a press split on the stand so journalists could take clean audio for their own recordings. The gallery was out of the meeting room and the space was back in Zeekr's hands before the public came through the doors.
The wider launch was picked up widely across the European automotive press in the days that followed.

If you have a product to put in front of the press, in a hall, on a stand, with one chance to get it right, contact us and we will talk it through.
Contact us